 Shilpa can complete a piece of work in 15 days and Shamita can complete the same piece of work in 24 days. In approximately, how many days can Shilpa and Shamita together complete the same piece of wo

Asked on by | Votes 0 | Views: 209 | Tags: quantitative aptitude     | time and work     | Add Bounty

 Shilpa can complete a piece of work in 15 days and Shamita can complete the same piece of work in 24 days. In approximately, how many days can Shilpa and Shamita together complete the same piece of wo

A). 3 days

B). 6 days

C). 9 days

D). 12 days


Share on Facebook      Share on Whatsapp       Share on Twitter




1 answers

0 vote
Answered by on | Votes 0 |

9 days



Shilpa's 1 day's work = 1/15
Shamita's 1 day's work = 1/24
Shipla + Shamita's 1 day's work
= 1/15 + 1/24 = 8+5/120 = 13/120
∴ Both together will complete the work in 120/13 = 9 days

Join Telegram Group




Answer This Question

Name:
Email:
Answer :
Sum of (4+5)
Submit:

Other Questions

1. Two pipes P and Q can fill the tank in 28 hours. Had they been opened separately, P would have taken twice the time as Q to fill the cistern. How much time will Q take to fill the cistern alone?

2. 12 men and 1 woman can complete a piece of work in 14 days while 4 women and 2 men can do the same work in 8 days. If a man gets Rs. 180 per day. then a woman will get per day

3.  A pipe can empty a tank in 15 hours and another can in 10 hours. If both the pipes are opened simuitaneously, how long will it take to completely empty a full tank ?

4.  A vessel of 50 litres is filled with milk and water. 40% of the milk and 15% of the water is taken out of the vessel. It is found that the vessel is emptied by 30%. What was the initial quantity of mi

5.  A and B together can complete a piece of work in 12 days, B and C can do it in 20 days and C and A can do it in 15 days. A, B and C together can complete it in

6.  How many seconds will a train 100 meters long take to cross a bridge 150 meters long if the speed of the train is 36 kmph?

7. Given below are two quantities named A & B. Based on the given information, you have to determine the relation between the two quantities. You should use the given data and your knowledge of Mathematics to choose between the possible answers. Quantity A: A and B together, B and C together and C

8. A does half as much work as B in three fourth of the time. lf together they take 18 days to complete the work, how much time will B alone take to do it ?

9. 4 men can complete a piece of work in 3 days. 6 women can complete the same piece of work in 3 days, whereas 3 children can complete the same piece of work in 8 days. 3 women and 4 children worked together for 1 day. If only men were to finish the remaining work in 1 day, how many total men would be required?

10. Two pipes can fill a tank in 10 hours and 12 hours respectively, while a third pipe empties the full tank in 20 hours. If all the three pipes operate simultaneously, in how much time the tank will be filled?