A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is:
A). 5/15
B). 6/15
C). 7/15
D). 8/15
8/15
Working together, the No. of days taken by them to finish the work = 15 × 20/35
= 60/7 days
Then, their 1 day’s work = 7/60
Their, 4 days work = 7 × 4/60 = 7/15 of the total work
Therefore, the fraction of the work, that is left = 1- 7/15 = 8/15.