8 men can dig a pit in 20 days. If a man works half as much again a s a boy, then 4 men and 9 boys can dig a similar pit in:
A). 10 days
B). 12 days
C). 15 days
D). 16 days
16 days
1 work done = 8 × 20
1 man = 3/2 Boys
1 boy = 2/3 men
Then, 9 boys = 9 × 2/3 men = 6 men
Then, 4 men + 9 boys = 10 men
Then, 8 × 20 = 10 × ?days
? days = 8 × 20/10 = 16 days.