If 80 persons can finish a work within 16 days by working 6 hours a day. the number of hours a day, should 64 persons work to finish that very job within 15 days is:

Asked on by | Votes 0 | Views: 51 | Tags: time and work     | quantitative aptitude     | ssc chsl 2012     | Add Bounty

If 80 persons can finish a work within 16 days by working 6 hours a day. the number of hours a day, should 64 persons work to finish that very job within 15 days is:
1). 5 hrs.
2). 7 hrs.
3). 8 hrs.
4). 6 hrs.


Share on Facebook      Share on Whatsapp       Share on Twitter




1 answers

1 vote
Answered by on | Votes 1 |
8 hrs. seems correct.

Join Telegram Group




Answer This Question

Name:
Email:
Answer :
Sum of (5+2)
Submit:

Other Questions

1. Two taps P and Q can fill a tank in 24 hours and 18 hours respectively. If the two taps are opened at 11 a.m., then at what time (in p.m.) should the tap P be closed to completely fill the tank at exactly 2 a.m?

2. The part of work done by A in 1 day is 1/5th of the part of work done by B in 1 day. A? s 1 day?s work is 3/4th of C?s 1 day?s work. C alone can complete the work in 24 days. In how many days will B alone do the same work ?

3. 10 men working 6 hours a day can complete a work in 18 days. How many hours a day must 15 men work to complete the same work in 12 days ?

4. Anju and Bablu can do a job together in 18 days. Anju is \(3\frac{2}{3}\) times more efficient than Bablu. The same job can be done by Bablu alone in

5. A can do a piece of work in 6 days and B can do it in 4 days separately. How many days would it take for both A and B to finish the same work together?

6.  A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in:

7. A, B and C can together do a job in 9 days. C alone can do the job in 36 days. In how many days can A and B do 50% of the job working together?

8. Ravi does half as much work as Rahim in four-fifth of the time. If together they take 40 days to complete the work, how much time shall Ravi take to do it?

9.  A and B can do a piece of work in 48 days, A and C can do it in 60 days, b and c can do it 72 days. In what time can c alone do it?

10. Pipe A, B and C can fill an empty tank alone in 6 hours, 8 hours and 12 hours respectively. A tank is initially 1/6 filled. Pipes A and B are simultaneously opened in the tank and closed after 2 hours. Now, if pipe C is opened in the tank, in how much time will it be filled?