P and Q can do a project in 12 and 12 days respectively. In how many days can they complete 50% of the project if they work together?
1). 6 days
2). 3 days
3). 18 days
4). 1.5 days
1. Findout the odd word/letters/number/number pair from the given alternatives.23 : 8 : : 62 : ?
2. For which one of the following, 'Diodes' are generally used for?
3. What is the equation of the line which passes through the points (3,2) and (5,3)?
4. Which drug is used as an Anti
5. The Chemical formula of Ammonium dichromate is _____.
6. A solid has 12 vertices and 30 edges. How many faces does it have?
7. A broad, low embankment built up along the banks of a river channel during floods is called
9. $If\ (2x+\frac{2}{9x})=4,\ then\ the\ value\ of\ 27x^{3}+ \frac{1}{27x^{3}}\ is $