Pipe A can fill a tank in 12 hours and Pipe B can fill the tank in 18 hours. If both the pipes are opened on alternate hours and if pipe B is opened first, then in how much time (in hours) the tank will be full?

Asked on by | Votes 0 | Views: 22 | Tags: time and work     | quantitative aptitude     | Add Bounty

Pipe A can fill a tank in 12 hours and Pipe B can fill the tank in 18 hours. If both the pipes are opened on alternate hours and if pipe B is opened first, then in how much time (in hours) the tank will be full?


1). 14.5
2). 14
3). 15.5
4). 15


Share on Facebook      Share on Whatsapp       Share on Twitter




1 answers

0 vote
Answered by on | Votes 0 |

1-hour Efficiency of pipe A: 1/12

1-hour Efficiency of pipe B: 1/18

If both opened together, work done in 2 hours: 1/18 + 1/12 = 5/36

After 14 hours, work done = 5 × 7/36 = 35/36.

Work left = 1 – 35/36 = 1/36. This work will be done by pipe B in h hours.

⇒ h/18 = 1/36

⇒ h = 1/2Therefore, total time = 14.5 hours

Accepted Answer

Join Telegram Group




Other Questions

1. A can do a work in 24 days and B can do the same work in 15 days. B worked on it for 5 days and left the job. In how many days, A alone can finish the remaining work?

2. A can do a piece of work in 6 days. B is 25 % more efficient than A. How long would B alone take to finish this work ?

3. 3 women and 18 children together take 2 days to complete a piece of work. How many days will 9 children alone take to complete the piece of work if 6 women alone can complete the piece of work in 3 days?

4. A is thrice as good a workman as B and therefore is able to finish a Job in 40 days less than B. Working together, they can do it in

5. A garrison of 450 men had provision for 42 days, when given at the rate of 550 gms per head. At the end of 10 days a reinforcement arrives and it was found that the provisions will last 15 days more, when given at the rate of 825 gms per head.What is the strength of the reinforcement?

6. A alone can complete a work in 25 days while B can complete the same work in 20 days. They worked together for 5 days and then A left. In how many days the remaining work will be completed?

7.  A alone can finish a work in 10 days which B alone can finish in 15 days. If they work together and finish it, then out of a total wages of Rs.3000, A will get:

8. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day ?

9.  A and B can do a piece of work in 15 days. B and C can the same work in 10 days and A and C can do the same in 12 days. Time taken by A, B and C together to do the job is

10. Two pipes A and B can fill a tank in 36 hours and 45 hours respectively. If both the pipes are opened simultaneously, how much time will be taken to fill the tank?