ExamCompetition Forum Question Papers Ask A Question Mock Test Learn & Earn Sign Up Login Menu



0 vote

If 20 men can build a wall 25 meters long in 4 days, what length of a similar wall can be built by 30 men in 6 days?

Asked on by | Votes 0 | Views: 27 | Tags: time and work     | quantitative aptitude     | Add Bounty

If 20 men can build a wall 25 meters long in 4 days, what length of a similar wall can be built by 30 men in 6 days?
1). 11.11 m
2). 50 m
3). 56.25 m
4). 62.6 m


Share on Facebook      Share on Whatsapp       Share on Twitter




1 answers

0 vote
Answered by on | Votes 0 |

20 men can build a wall 25 meters long in 4 days

More men work, length of wall built is more. Number of working days increases the length of wall built

So it is a case of direct proportion

Length of a wall built by 30 men in 6 days = 25 × (30 × 6)/(20 × 4) = 56.25 metre

Join Telegram Group




Answer This Question

Name:
Email:
Answer :
Sum of (5+4)
Submit:

Other Questions

1.  Two persons A and B can finish a piece of work in 60 days, while A, B, and C can finish the same work in 40 days. How many days will C alone take to finish the work ?

2. P can complete a work in 15 days and Q in 24 days. They began the work together but Q left the work 2 days before its completion. In how many days was the work completed?

3. Two taps can fill a tank in 20 minutes and 30 minutes respectively. There is an outlet tap at exactly half level of that rectangular tank which can pump out 248 liters of water per minute. If the outlet tap is open, then it takes 24 minutes to fill an empty tank. What is the volume of the tank?

4.  A can finish a work in 18 days and B can do the work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work

5. B is $${4 \over 3}$$ times as efficient as A. If A can complete $${5 \over 8}$$th of a given task in 15 days, what fraction of the same task would remain incomplete if B works on it independently for 10 days only?

6. A and B together can do a piece of work in 10 days. A alone can do it in 30 days. The time in which B alone can do it is

7.  'A' and ' B ' can do a piece of work in 25 days and 30 days respectively. Both start the work together but 'A' leaves the work 8 days before its completion. Find the time in which the work is finished

8. A can do a piece of work in 8 days and B can do it in 10 days separately. How many days would it take for both A and B to finish the same work together?

9. A, Band C completed a work costing Rs. 1,800. A worked for 6 days, B for 4 days and C for 9 days. If their daily wages are in the ratio of 5:6:4, how much amount will be received by A?

10. A can do a work in 36 days and B in 12 days. If they work on it together for 3 days, then what fraction of work is left?