A is twice as good a workman as B and together they finish a piece of work in 14 days. The number of days taken by A alone to finish the work is:
A). 14 days
B). 16 days
C). 19 days
D). 21 days
21 days
A’s work is twice as B’s work
So, we can consider 2A = B
Then, A × 2A/ A+ 2A = 14
2A × A/ 3A = 14
2 A = 14 × 3
A = 21 days. i.e. A alone can finish the work in 21 days.