'A' can complete a piece of work in 5 days and ' B ' can complete the same piece of work in 10 days. In how many days can 'A' and ' B ' together complete the same work ?
A). 25 days
B). 26 days
C). 28 days
D). 31 days
31 days
A can do 1/5 work per day.
B can do 1/10 work per day.
Therefore, (A + B) can do 1/5 + 1/10 = 3/10 per day
Therefore, Total number of days to complete work = 1/3/10 = 10/3 days