 A certain number of men complete a piece of work in 60 days. If there were 8 men more, the work could be finished in 10 days less. How many men were originally there?

Asked on by | Votes 0 | Views: 35 | Tags: quantitative aptitude     | time and work     | Add Bounty

 A certain number of men complete a piece of work in 60 days. If there were 8 men more, the work could be finished in 10 days less. How many men were originally there?

A). 20 men

B). 30 men

C). 40 men

D). 50 men


Share on Facebook      Share on Whatsapp       Share on Twitter




1 answers

0 vote
Answered by on | Votes 0 |

40 men




Let ‘x’ be the original number of men 

Then 1 work done = x × 60 

Then, 60x = (x + 8) 50 

60x = 50x + 400 

10 x = 400 

x = 40.

Join Telegram Group




Answer This Question

Name:
Email:
Answer :
Sum of (1+3)
Submit:

Other Questions

1. A can do a work in 24 days and B in 40 days. If they work on it together for 10 days, then what fraction of work is left?

2. A tap can fill a tank in 36 minutes and another can empty it in 18 minutes. If the tank is already ½ full and both the taps are opened together, will the tank be filled or emptied? How long will it take before the tank is either filled completely or emptied completely, as the case may be?

3. P is twice as efficient as Q. Q takes 12 days to complete a job. If both of them work together, how much time will they take to complete the job?

4. Two pipes A and B can fill an empty cistern in 8 hours and 10 hours respectively. If both the pipes are simultaneously opened in an empty cistern, what part of the cistern is filled after 4 hours?

5. A daily wage worker was paid Rs. 1990 during a period of 30 days. During this period, he was absent for 4 days and was fined Rs. 20 per day for absence. He was paid the full salary only for 20 days as he came late on the other days. Those who came late were given only half the salary for that day. What was the total salary paid per month to a worker who came on time every day and was never absent?

6. A and B together can do a piece of work in 6 days. If A can alone do the work in 18 days, then the number of days required for B to finish the work is

7.  A and B can finish a piece of work in 12 days and 18 days respectively. A begins to do the work and they work alternately one at a time for one day each. The whole work will be completed in

8. A is thrice as efficient as B and takes 10 days less to do a piece of work than B takes to do the same work. In how many days, B alone can finish the whole work ?

9. Two men can do a piece of work in x days. But y women can do that in 3 days. Then the ratio of the work done by 1 man and 1 woman is

10.  ‘A’ can complete a piece of work in 12 days ‘A’ and ‘B’ together can complete the same piece of work in 8 days. In how many days can ‘B’ alone complete the same piece of work?