ExamCompetition Forum Question Papers Ask A Question Mock Test Learn & Earn Sign Up Login Menu



0 vote

A daily-wage labourer was engaged for a certain number of days for Rs. 5,750; but being absent on some of those days he was paid only Rs. 5,000. What was his maximum possible daily wage ?

Asked on by | Votes 0 | Views: 605 | Tags: time and work     | quantitative aptitude     | ssc cpo 2006     | Add Bounty

A daily-wage labourer was engaged for a certain number of days for Rs. 5,750; but being absent on some of those days he was paid only Rs. 5,000. What was his maximum possible daily wage ?
1). Rs. 125
2). Rs. 250
3). Rs. 375
4). Rs. 500


Share on Facebook      Share on Whatsapp       Share on Twitter




2 answers

1 vote
Answered by on | Votes 1 |
option 2 is the right answer

Join Telegram Group




2 vote
Answered by on | Votes 2 |
take the HCF of 5750 and 5000, ans will be 250




Answer This Question

Name:
Email:
Answer :
Sum of (2+2)
Submit:

Other Questions

1.  Ram, Shyam and Mohan can do a piece of work in 12, 15 and 20 days respectively. How long will they take to finish it together?

2. Three men, four women and six children can complete a work in seven days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 7 days?

3. P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?

4. Time taken by A and B to complete a work is in the ratio 2 : 3. A alone worked for 5 days and left the work then B alone worked for 10 days on the same work, It is found than 70% of the work is completed. Find the time in which they together can complete the work.

5.  A and B together can complete work in 4 days. A alone starts working and leaves it after working for 3 days completing only half of the work. In how many days it can be completed if the remaining job

6.  A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work complete

7.  Five men and nine women can do a piece of work in 10 days. Six men and twelve women can do the same work in 8 days. In how many days can three men and three women do the work?

8. Parimal has done 1/4 th of a job in 10 days, Salim completes the rest of the job in 20 days. In how many days can they together do the job?

9. Two labourers A and B are paid a total of Rs. 1120 per day. If A is paid 180 percent of what is paid to B, how much (in Rs) is B paid?

10.  A train can travel 50% faster than a car. Both start from point A at the same time and reach point B 75 kms away from A at the same time. On the way, however, the train lost about 12.5 minutes while s