ExamCompetition Forum Question Papers Ask A Question Mock Test Learn & Earn Sign Up Login Menu



0 vote

 A does 4/5th of a work in 20 days. He then assembles in B and they complete the remaining work in 3 days. To what extent B alone would take to do the entire work?

Asked on by | Votes 0 | Views: 17 | Tags: quantitative aptitude     | time and work     | Add Bounty

 A does 4/5th of a work in 20 days. He then assembles in B and they complete the remaining work in 3 days. To what extent B alone would take to do the entire work?

A). 23 days

B). 37 days

C). 75/2 days

D).  40 days


Share on Facebook      Share on Whatsapp       Share on Twitter




1 answers

0 vote
Answered by on | Votes 0 |

75/2 days



NA

Join Telegram Group




Answer This Question

Name:
Email:
Answer :
Sum of (1+4)
Submit:

Other Questions

1. Three taps A, B and C can fill a tank in 12 hours, 15 hours and 20 hours respectively. If all the taps are opened at 12 PM, then at what time (in PM) should the tap A and C be closed to fill the tank completely at exactly 9 PM?

2. A man is twice as fast as a woman and a woman is twice as fast as a boy in doing a work. If all of them, a man, a woman and a boy can finish the work in 7 days, in how many days a boy will do it alone ?

3.  10 men can complete a work in 7 days. But 10 women need 14 days to complete the same work. How many days will 5 men and 10 women need to complete the work?

4. 8 workers can build a wall 18 m long, 2 m broad and 12 m high in 10 days, working 9 hours a day. Find how many workers will be able to build a wall 32 m long, 3 m broad and 9 m high in 8 days working 6 hours a day ?

5. A swimming pool has 3 pipes to drain off the water. The first two pipes A and B, operating simultaneously, can empty the pool in 9/16 the time than that taken by C alone. Pipe A, working alone, takes one third the time taken by pipe B. All of them together take 2 hrs 24 minutes to empty the pool. Time taken by pipe A to empty the pool in hours is

6. Given below are two quantities named A and B. Based on the given information, you have to determine the relation between the two quantities. You should use the given data and your knowledge of Mathematics to choose between the possible answers. Quantity A: A and B can do a work in 8/3 days, B and C can do the same work in 3 days and A and C can do the same work in 24/5 days. In what time C alone can complete the work? Quantity B: 15

7. B would have taken 10 hours more than what A would have taken to complete a task if each of them worked alone. Working together they can complete the task in 12 hours. How many hours would B take to do 50% of the task?

8. Ronald and Elan are working on an Assignment. Ronald takes 6 hours to type 32 pages on a computer, while Elan takes 5 hours to type 40 pages. How much time will they take working together on two different computers to type an assignment of 110 pages ?

9. If 1 man or 2 women or 3 boys can do a piece of work in 44 days, then the same piece of work will be done by 1 man.1 woman and 1 boy in

10.  Rajesh and Ajay can complete a job in 16 days. Rajesh alone can do it in 24 days. How long will Ajay alone take to finish the whole work?