A and B can do a job together in 7 days. A is 13/4 times as efficient as B. The same job can be done by A alone in
A). (A's 1 day's work) : (B's 1 day's work) = 7/4 : 1 = 7 : 4.
B). Let A's and B's 1 day's work be 7x and 4x respectively.
C). Then, 7x + 4x = 1/7 => 11x = 1/7 => x = 1/77 .
D). Therefore A's 1 day's work = ( 1/77 x 7 ) = 1/11 = 11 days
(A's 1 day's work) : (B's 1 day's work) = 7/4 : 1 = 7 : 4.
NA