Most accurate method of estimation is based on:
1). Building cost index estimate.
2). Plinth area estimate.
3). Detailed estimate.
4). Cube rate estimate.
For ten cubic meter of brick masonry, the number of modular bricks needed is:
1). 4500
2). 5000
3). 5500
4). 6000
Using straight line method annual deprecation D is equal to:
1). \(\frac{{Original\;cost - life\;in\;year}}{{Scrap\;value}}\)
2). \(\frac{{Original\;cost - Scrap\;value}}{{life\;in\;year}}\)
3). \(\frac{{Life\;in\;year - Scrap\;value}}{{Original\;cost}}\)
4). \(\frac{{Scrap\;value - Life\;in\;year}}{{Original\;cost}}\)
The gradual reduction in value with age of a property is known as _________.
1). revaluation
2). appreciation
3). depreciation
4). devaluation
The minimum width to be provided for a stair case for educational building is:
1). 3 m
2). 1.5 m
3). 1 m
4). 0.8 m