The plan of a building is in the form of a square with centreline dimensions of outer walls as 9.6 m × 14.6 m. If the thickness of the wall in superstructure is 0.40 m, then its plinth area is:

Asked on by | Votes 43

The plan of a building is in the form of a square with centreline dimensions of outer walls as 9.6 m × 14.6 m. If the thickness of the wall in superstructure is 0.40 m, then its plinth area is:
1). 100 m2
2). 150 m2
3). 200 m2
4). 250 m2

0 vote

Wheel Barrow is an equipment used in a concrete project for

Asked on by | Votes 0

Wheel Barrow is an equipment used in a concrete project for
1). Batching aggregates
2). Mixing concrete
3). Mixing water
4). Transporting concrete

0 vote

Floor area ratio (FAR) means:

Asked on by | Votes 0

Floor area ratio (FAR) means:
1). \(\begin{array}{*{20}{c}} {\underline {(Total\;floor\;area\;of\;all\;floors - \;Area\;of\;ground\;floor} )}\\ {Area\;of\;plot} \end{array}\)
2). \(\begin{array}{*{20}{c}} {\underline {(Total\;floor\;area\;of\;all\;floors - \;Area\;of\;ground\;floor} )}\\ {Area\;of\;plinth} \end{array}\)
3). \(\frac{{Total\;floor\;area\;of\;all\;floors}}{{Area\;of\;plot}} \times 100\)
4). \(\frac{{Total\;floor\;area\;of\;all\;floors}}{{Area\;of\;plinth}}\)

23 vote

A fixed stipulated sum of penalty payable by the contractor for the ordinary damage having relation with the actual damage is known as

Asked on by | Votes 23

A fixed stipulated sum of penalty payable by the contractor for the ordinary damage having relation with the actual damage is known as
1). Liquidated damage
2). Unliquidated damage
3). Fixed penalty
4). Compensatory payment

0 vote

Structural / architectural changes are prerequisite for

Asked on by | Votes 0

Structural / architectural changes are prerequisite for
1). Detailed estimate
2). Preliminary estimate
3). Supplementary estimate
4). Revised estimate