Estimating Practice Questions & Answers

29 vote

The money which have to be deposited by the contractor while submitting a tender, which is approximately about 2% of the estimated cost, with the department as the guarantee of the tender is called as

Asked on by | Votes 29

The money which have to be deposited by the contractor while submitting a tender, which is approximately about 2% of the estimated cost, with the department as the guarantee of the tender is called as
1). Security money
2). Earnest money
3). Binder money
4). Front money

-1 vote

The thickness of slabs and the sectional dimensions of columns should be taken to the nearest

Asked on by | Votes -1

The thickness of slabs and the sectional dimensions of columns should be taken to the nearest
1). 0.100 m
2). 0.010 m
3). 0.020 m
4). 0.005 m

54 vote

A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called _________

Asked on by | Votes 54

A document containing detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called _________
1). Tender
2). Schedule of rates
3). Analysis of rate
4). Abstract estimate

0 vote

Which of the following is not a type of methods of preliminary estimate?

Asked on by | Votes 0

Which of the following is not a type of methods of preliminary estimate?
1). Time referenced cost estimate
2). Cost capacity factor
3). Installation cost ratio
4). Procurement cost factor

0 vote

The material cost of a similar construction project that was completed four years ago was Rs. 30,00,00,000 and the material cost index was 500. Calculate the approximate material cost for the new project, if material cost index now is 600.

Asked on by | Votes 0

The material cost of a similar construction project that was completed four years ago was Rs. 30,00,00,000 and the material cost index was 500. Calculate the approximate material cost for the new project, if material cost index now is 600.
1). Rs. 20,00,00,000
2). Rs. 25,00,00,000
3). Rs. 36,00,00,000
4). Rs. 45,00,00,000