Which Indian Standard code is used for the methods of measurement of building and civil engineering works for “Brickwork”?

Asked on by | Votes 0

Which Indian Standard code is used for the methods of measurement of building and civil engineering works for “Brickwork”?
1). IS 1200: Part 1: 1992
2). IS 1200: Part 2: 1974
3). IS 1200: Part 3: 1976
4). IS 1200: Part 4: 1976

30 vote

A 20 mm diameter mild steel rod is chosen for the construction work according to the calculation results. The weight of the above rod per meter length will be

Asked on by | Votes 30

A 20 mm diameter mild steel rod is chosen for the construction work according to the calculation results. The weight of the above rod per meter length will be
1). 0.75 kg
2). 1.45 kg
3). 2.50 kg
4). 3.99 kg

42 vote

A written document with details which kept in record as a proof of payment is called

Asked on by | Votes 42

A written document with details which kept in record as a proof of payment is called
1). Bill
2). Voucher
3). Hand receipt form
4). Final bill form

16 vote

The technique of finding the fair price of an existing building or property is known as ________

Asked on by | Votes 16

The technique of finding the fair price of an existing building or property is known as ________
1). Estimation
2). Valuation
3). Pricing
4). Costing

29 vote

In which of the following the contractor undertakes the execution or construction of a specific work with all its contingencies, to complete it in all respect within a specified time for fixed amount?

Asked on by | Votes 29

In which of the following the contractor undertakes the execution or construction of a specific work with all its contingencies, to complete it in all respect within a specified time for fixed amount?
1). Item rate contract
2). Lump sum contract
3). Percentage rate Contract